Zoeller - Rail Systems and Disconnect

Complete systems for sewage, effluent and grinder pumps can be field-installed or factory-installed in concrete, steel or fiberglass basins and tanks. Guide rails direct the pump to and from the base elbow.

DISCONNECT ONLY (1¼", 1½" & 2" Discharge)

Disconnect Fitting: used for shallow systems where guide rails are not necessary (pull rod not included).

COMPLETE SYSTEMS
(1¼", 1½", 2" & 3" Vertical Discharge & 1¼" Horizontal Discharge)

Rail & Disconnect Systems for effluent or sewage pumps allow for removal and reinstallation of pumps without getting in or removing fluid from the pit.

Guide rails direct the pump to and from the coupling base. Systems are supplied complete with coupling base, sealing plate, pump discharge elbow, and upper rail support bracket. All systems use schedule 40 pipe rails (not included).

39-0134, 1-1/4" vertical x 2" NPT
39-0131, 1-1/2" vertical x 2" NPT
39-0128, 2" vertical x 2" NPT
39-0074, 3" vertical x 3" NPT
39-0137, 1-1/4" horizontal x 2" NPT
Pipe rails, pull rods and intermediate brackets not included.